WORLD NUCLEAR ENERGY

Sources & evidence

Primary-source links, observation dates and the limits attached to each use.

Source review date: 9 November 2026. Site summaries are original, abbreviated explanations. Linked publishers remain authoritative for their own decisions and data.

IEA26

IEA — Global Energy Review 2026: electricity supply

2026 report; 2025 observations
Nuclear output grew 1.2% in 2025 and reached a record. Original site summaries; source report licensed CC BY 4.0.

https://www.iea.org/reports/global-energy-review-2026/electricity-supply

IEA25

IEA — Global Energy Review 2025: electricity

2025 report; 2024 observations
Nuclear supplied 9% of global electricity in 2024. Capacity and output are different measures. CC BY 4.0.

https://www.iea.org/reports/global-energy-review-2025/electricity

IAEA-SMR

IAEA — Small modular reactors

Undated topic page; accessed 9 November 2026
SMR definition and a gateway to the current ARIS catalogue. This site does not repeat the page’s undated design counts as current statistics.

https://www.iaea.org/topics/small-modular-reactors

IAEA-INFRA

IAEA — Nuclear infrastructure development

Undated topic page; accessed 9 November 2026
Institutions, people and long-term commitments around a nuclear programme. National decisions remain sovereign.

https://www.iaea.org/topics/infrastructure-development

IAEA-MILE

IAEA — Milestones Approach

Framework page; accessed 9 November 2026
The framework covers 19 infrastructure issues. Our evidence brief is a small discussion aid, not an implementation of this framework.

https://nucleus.iaea.org/sites/nids/capacity/milestones/SitePages/Home.aspx

CNSC-DNNP

CNSC — Darlington New Nuclear Project

Current project page; accessed 9 November 2026
One BWRX-300 under construction. A construction licence is distinct from an operating licence; the operating application is under review.

https://www.cnsc-ccsn.gc.ca/eng/reactors/new-reactor-power-plant-projects/new-reactor-power-plant-facilities/darlington-new-nuclear-project/?pedisable=false

NRC-AP300

US NRC — Westinghouse AP300

Pre-application page including June 2026 update; accessed 9 November 2026
US pre-application engagement is not a design certification or a licence to construct or operate.

https://www.nrc.gov/facilities-safety/new-reactors/advanced-reactors/who-were-working-with/pre-application-activities/westinghouse-ap300

W-AP1000

Westinghouse — AP1000 overview

Vendor product page; accessed 9 November 2026
AP1000 is a large pressurised-water reactor. Vendor statements are attributed to the vendor, not adopted as independent performance guarantees.

https://westinghousenuclear.com/new-plants/ap1000-pwr/overview/

EDF-NEW

EDF — New nuclear

Programme overview; accessed 9 November 2026
EPR, EPR2 and the developing NUWARD platform. Announced programmes and operational assets are kept separate.

https://www.edf.fr/en/the-edf-group/sustainable-production/new-nuclear

EDF-GRID

EDF — Flamanville first grid connection

21 December 2024
A specific dated milestone; not a claim about current availability or completion of all subsequent testing.

https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/update-on-the-flamanville-epr-the-reactor-produces-its-first-electrons-on-the-national-electricity-grid

GVH

GE Vernova Hitachi — Nuclear energy

Vendor overview; accessed 9 November 2026
Reactor technology, fuel and lifecycle services. Vendor construction targets are not used as whole-project delivery promises.

https://www.gevernova.com/nuclear

NUWARD

NUWARD — Our SMR solution

Developing platform; accessed 9 November 2026
Current vendor positioning for electricity and heat; no older configuration is represented as a current licensed design.

https://www.nuward.com/en/our-smr-solution